搜索结果: 1-2 共查到“动力与电气工程 waste”相关记录2条 . 查询时间(0.053 秒)
TECHNICAL AND ECONOMIC ASPECTS OF WASTE HEAT UTILISATION
case study cost analysis refrigeration installation
font style='font-size:12px;'>
2009/10/14
The main aim of the following presentation is the comparison and evaluation of the conditions for waste heat utilization in Germany and in Poland. This paper presents synthetically the results of econ...
PROSPECTS FOR CO-FIRING OF CLEAN COAL AND CREOSOTE-TREATED WASTE WOOD AT SMALL-SCALE POWER STATIONS
co-combustion clean coal railway sleepers
font style='font-size:12px;'>
2009/10/13
If a small-scale clean coal fueled power plant is co-fueled with 5% of creosote-treated used-up sleeper wood, the decontamination by carbonisation at 500°C in an indirectly heated rotary kiln with the...