搜索结果: 1-1 共查到“航空、航空系统工程 SBAS MOPS”相关记录1条 . 查询时间(0.062 秒)
Qualifying an L5 SBAS MOPS Ephemeris Message to Support Multiple Orbit Classes
Qualifying SBAS MOPS Ephemeris Message Multiple Orbit Classes
font style='font-size:12px;'>
2015/6/24
The L1 Minimum Operational Performance Standards (MOPS) were designed under the premise that Satellite Based Augmentation Systems (SBAS) be supported by communications satellites in geostationary orbi...